Biomass Boiler Case Studies

 

One Megawatt district heating system heating 8 poultry houses, Lincolnshire.

Total RHI Income £2,840,000
Timescale 4 weeks

 

 

86no WES and ETA containers installed on Lincolnshire poultry farm sites. (single project)

Annual RHI Income Over £2million
Payback Period Approx 5 years
Timescale 8 months
Additional Benefit “Green Stamp” on poultry products

 

 

 

 

 

18no. 193kW installations of 100 & 93kW cascaded wood chip and pellet boilers, Lincolnshire and Cambridgeshire.

Annual RHI Income £383,446
Payback Period 2.1 years
Timescale 2 months
Additional Benefit Two boilers cascaded together offer eachother a backup heat supply

 

 

 

 

2no 199kW boilers heating a painting and coatings facility, South Yorkshire.

Annual RHI Income £39,746
Project value after CapEx and OpEx £803,048
Payback Period 2.9 years
Timescale 1 week to become RHI ready, 2 more weeks to completion

 

 

 

 

200kW Biomass heating system with Air Handling Unit used for drying grain, Lincolnshire.

Annual RHI Income £19,873
Project value after CapEx and OpEx £307,095
Payback Period 4.8 years
Timescale Made RHI ready within 1 week, completed in 1 additional week

 

 

 

 

5no 199kW biomass boilers heating 9no poultry sheds, Lincolnshire.

Annual RHI Income £88,905
Payback Period 5.8 years
Timescale 1 week to make RHI ready, 2 weeks to complete the installation

 

 

 

 

 85kW biomass cabin heating a children’s day nursery and domestic residence in Lincolnshire.

Annual RHI Income £9,382
Payback Period 5.2 years
Timescale 1 week

 

 

 

 

2no. 199kW Eco-Cabins supplying heat to game hatcheries in Manchester.

Annual RHI Income £39,746
Payback Period 4.3 years
Timescale 1.5 weeks

 

 

 

 

150kW Eco-Cabin heating a pig rearing unit in Lincolnshire.

Annual RHI Income £16,556
Project value after CapEx and OpEx £183,718
Payback Period 5.7 years
Timescale 4 days

 

 

 

 

199kW ETA Energy Cabin heating a care home facility in Wiltshire.

Annual RHI Income £19,873
Payback Period 6.4 years
Timescale 5 days

 

 

 

199kW biomass boiler heating a workshop, pig rearing unit and farmhouse in South Yorkshire.

Annual RHI Income £21,965
Project value after CapEx and OpEx £416,691
Payback Period 3.5 years
Timescale The retro fit took less than 1 week

 

 

 

4no 199kW biomass boilers heating 4no poultry sheds in Saxilby.

Annual RHI Income Over £90,000
Payback Period 4 years
Timescale Each project took less than 1 week

 

 

 

 3no biomass boilers (18-40kW) used for biomass boiler training in Retford, Yorkshire.

Annual RHI Income £7,379
Payback Period 5 years
Timescale Installed in 5 days

 

 

 

199kW biomass boiler heating a Nursing home in Wales.

Annual RHI Income £10,930
Payback Period 7.4 years
Timescale Installed in 1 week

 

 

 

250kW District Heating installation and energy centre heating 11 houses & flats, North Yorkshire.

Annual RHI Income Installed prior to RHI
CO2 Saved per Annum 95 tonnes
Timescale 3 weeks

 

 

 

197kW and 199kW biomass boilers curing onions and heating a workshop, offices and dwelling in Nottinghamshire.

Annual RHI Income £41,425
Payback Period 3.2 years
Timescale Each installation took less than 1 week

 

 

 

85kW boiler heating a Medical Centre in North Yorkshire.

Annual RHI Income £9,829
Payback Period 2.4 years
Timescale The installation took 6 days

 

 

 

199kW Log Gasification boiler powering a log drying kiln in Swansea. 

Annual RHI Income £22,487
Payback Period 1.4 years
Timescale Less than 1 week